BIS notified the date of establishment and withdrawal of Equal Cross Body for Oil Hydraulic Couplings

Aug 30, 2023 | by TeamLease RegTech Legal Research Team

Free Legal updates for the week 00


Commercial ComplianceBIS notified the date of establishment and withdrawal of Equal Cross Body for Oil Hydraulic Couplings

The Bureau of Indian Standards, (BIS) on August 28, 2023, notified the date of establishment and withdrawal of a few Indian standards particulars.

In the following particulars, the date of establishment is August 17, 2023

•IS 9746 (Part 1): 2023 Equal Cross Body for Oil Hydraulic Couplings — Specification Part 1 Made from Forgings

•IS 9757 (Part 1): 2023 Bulkhead Elbow Body for Oil Hydraulic Couplings — Specification Part 1 Made from Forgings (First Revision)

•IS 10453 (Part 2): 2023 Taper Male Stud Tee Body (Stud Run) for Oil Hydraulic Couplings — Specification Part 2 Made from Bar Stocks (First Revision)

In the following particulars, the date of withdrawal is September 17, 2023

•IS 10453 (Part 2): 1983 Specification for Taper Male Stud Tee Body (Stud Run) for Oil Hydraulic Couplings Part 2 Made from Bar Stocks

•IS 9757 (Part 1): 1981 Specification for Bulkhead Elbow Body for Oil-Hydraulic Couplings Part 1 Made from Forgings

•IS 9746 (Part 1): 1983 Specification for Equal Cross Body for Oil Hydraulic Coupling Part 1 Made from Forgings

Disclaimer: Refer to the document to view further details.

[Notification No. HQ-PUB013/1/2020-PUB-BIS (682)]


Bookmark

Related Updates



Alternate Text

Get updates on the go on RegUpdate Mobile App.

NEW  ·  AI ASSISTANT