BIS notified the date of establishment and withdrawal of Earthquake Resistant Design of Structures

Mar 21, 2024 | by TeamLease RegTech Legal Research Team

Free Legal updates for the week 00


Commercial ComplianceThe Bureau of Indian Standards, (BIS) on March 20, 2024, notified the date of establishment and withdrawal of a few Indian standards particulars.

In the following particulars, the date of establishment is March 08, 2024

•IS 1893 (Part 4): 2024 Criteria for Earthquake Resistant Design of Structures Part 4 Industrial Structures and StackLike Structures (Second Revision)

•IS 2450: 2024 Electroplating on Aluminium and its Alloys — RecPractice (First Revision)

•IS 3088: 2024 Assaying commended of Fine Grade Palladium — Method (First Revision)

•IS 5454: 2024 Burnt Clay Bricks and Burnt Clay Tiles — Methods of Sampling (Second Revision)

In the following particulars, the date of withdrawal is April 08, 2023

•IS 5454: 1978 Methods for Sampling of Clay Building Bricks (First Revision) IS 8920: 1978 Methods for Sampling of Burnt Clay Tiles

•IS 3088: 1967 Method for Assaying of Fine Grade Palladium

•IS 2450: 1963 Recommended Practice for Plating on Aluminium and its Alloys

•IS 1893 (Part 4): 2015 Criteria for Earthquake Resistant Design of Structures Part 4 Industrial Structures Including Stack-Like Structures (First Revision)

 [Notification No. Ref: HQ-PUB013/1/2020-PUB-BIS (818)]


Bookmark

Related Updates



Alternate Text

Get updates on the go on RegUpdate Mobile App.

NEW  ·  AI ASSISTANT