Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024

Aug 01, 2024 | by TeamLease RegTech Legal Research Team

Free Legal updates for the week 00


Industry Specific ComplianceThe Central Electricity Regulatory Commission (CERC) on July 31, 2024, notified the Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024 to amend the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

The following has been stated: -

•A new Clause, namely, Clause (j-i), shall be added after Clause (j) in Regulation 2.1 of the Principal Regulations as under: 

(j-i) “Complex of ISTS substations

•Regulation 3.7 of the Principal Regulations shall be substituted as under: 

3.7 Withdrawal of Application for Connectivity or GNA and Treatment of Bank Guarantees

•The words “for a quantum of minimum quantum of 50 MW and above” shall be added at the end of Clause (d) of Regulation 4.1 of the Principal Regulations.

The comments/ suggestions/ objections may be sent to the undersigned on or before September 02, 2024.

URL: https://cercind.gov.in/2024/draft_reg/DR-GNA-Regulations-3rd-Amendment.pdf

This detailed notification is given in the document below.

[Notification No. No. L-1/261/2021/CERC]