EHS ComplianceThe Pollution Control Board, Assam (PCBA) on December 19, 2024, issued the notification regarding the clarification on installation of Effluent Treatment Plant (ETP).

The following has been stated namely: -

• Non-bedded healthcare facilities (HCF) shall not necessarily need to install Effluent Treatment Plant (ETP). 

• However, they must dispose infectious liquid wastes only after treatment by disinfection. 

• All the non-bedded HCFs including Dental Clinics need to obtain CTE/CTO and Authorisation for establishment and operation of such facilities.

[Notification No. TECH-13014/1/2024-CCA-PCBA]